Save this image free of charge in 800 pixels for layout use (right click, Save as...)
|
|
Ref : S06655
Theme :
Space Shuttle - General (1045 images)
Title : The Rotating Service Structure at Launch Pad 39A rolls back
Caption :
(10/05/2000) -- The Rotating Service Structure at Launch Pad 39A rolls back, revealing the Space Shuttle Discovery on the Mobile Launcher Platform. Discovery is being readied for the STS-92 mission launch to the International Space Station (ISS). The mission payload includes Integrated Truss Structure Z-1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power; Ku-band communication to support early science capability and U.S. television; and the third Pressurized Mating Adapter to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The 11-day mission will include four spacewalks. Liftoff is scheduled for Oct. 6 at 9:16 p.m. EDT
|
|